Slide Gate Operators / Eagle-2000 Series / Eagle-1000 Series
____________________
Methods of Installation
It is highly recommended to install "over travel stops" at both ends of the gate rail in any type of installation
in order to prevent derailing.
Front Installation
Rear Installation
____________________
Proper Chain Installation
Minimum space between gate and output sprocket must be 4". After you position the gate operator, bolt-down
the operator to the concrete bed. Make certain that the concrete bed is solid.
Eagle Access Control Systems, Inc. / (800) 708-8848 / www.eagleoperators.com
(7)
CAUTION!
!
The "No Weld
hain
comes standard with
all sliding gate units.
Recommended Positive Stop Locations
**
**
*
CORRECT
Comments to this Manuals